Civil Engineering Estimation Tool
Estimation Categories
Organize item entries across all standard civil engineering and structural building stages.
Substructure Works
Masonry & Finishes
Structural & Special
• Earthwork
• Area Calculator
• Volume Calculator
• Plain Cement Concrete (PCC)
• Reinforced Cement Concrete (RCC)
• Brick Masonry
• Block Masonry
• Plaster Work
• Mortar Calculator
• Painting
• Structural Concrete
• Reinforcement Steel
• Shuttering / Formwork
• Waterproofing
• Other Works
Quantity Calculation & Wastage Rule
Item dimensions combine with rate and wastage percentage automatically for accurate totals.
Formula: Final Quantity = Basic Quantity + Wastage
Example: Basic Quantity = 100 CFT | Wastage = 5% | Final Quantity = 105 CFT
Supported Conversion Pairs
Automatic Unit Conversion
• Feet ↔ Meter (ft / m) • Inches ↔ Feet (in / ft) • Square Feet ↔ Square Meter (sq ft / sq m) • Cubic Feet ↔ Cubic Meter (CFT / m³) • Kilograms ↔ Metric Ton (kg / ton) • Unit items (nos / cm / mm)
Switch smoothly between metric and imperial dimensions without formula errors. Conversion factors strictly prevent mixing linear, superficial area, and volumetric metrics.
